Site MapHelpFeedbackPractice Quiz
Practice Quiz
(See related pages)

TRUE/FALSE questions:

1
The System Implementation phase includes the tasks of development, installation, and testing of system components.
A)True
B)False
2
An unpopulated database means the database structure is implemented, but data has not been loaded into tables for testing the database.
A)True
B)False
3
The first activity of the construction phase is to write and test new programs.
A)True
B)False
4
The task of preparing a conversion plan is performed during the Systems Implementation phase.
A)True
B)False
5
A program test is a test performed on a subset of a program.
A)True
B)False
6
Staged conversion is a variation on the abrupt and parallel conversions.
A)True
B)False
7
Validation testing runs the system in a live environment using real data.
A)True
B)False
8
In parallel conversion, both the old and the new system are operated for some time period.
A)True
B)False
9
Verification testing is sometimes called alpha testing.
A)True
B)False
10
One of the validation tests performed during the systems acceptance testing is human engineering test.
A)True
B)False

Multiple Choice questions:

11
The person generally responsible for the program design strategy, standards, and construction is called a(n):
A)program librarian
B)backup chief programmer
C)network designer
D)chief programmer
E)systems analyst
12
Which one of the tests is performed on a subset of a program?
A)subset test
B)unit test
C)stub test
D)program test
E)system test
13
Which of the following is the last phase of the Systems Construction phase?
A)build and test databases
B)write and test new programs
C)prepare conversion plan
D)build and test networks
E)none of the above
14
Which installation strategy is a variation on the abrupt and parallel conversion?
A)location conversion
B)staged conversion
C)partial conversion
D)hierarchical conversion
E)none of the above
15
Which of the following is(are) the task(s) of the Systems Conversion phase?
A)prepare conversion plan
B)train users
C)convert to new system
D)build and test networks
E)none of the above
16
Which of the tests is a final system test performed by end users using real data over an extended period of time?
A)final test
B)complete test
C)systems acceptance test
D)parallel test
E)none of the above
17
Which of the following is(are) the primary inputs into the task of writing and testing new programs?
A)programming plan
B)database structure
C)test data
D)integration requirements
E)both (a) and (c)
18
Which of the following is the first phase of the Systems Implementation phase?
A)conduct system test
B)build and test networks
C)prepare conversion plan
D)build and test databases
E)write and test new programs
19
Which of the following is(are) the deliverables of the Systems Implementation phase?
A)training materials
B)functional system
C)physical design specification
D)operational system
E)none of the above
20
Which of the following is(are) the inputs to the Systems Construction phase?
A)design prototypes
B)redesigned business processes
C)physical design specifications
D)documentation
E)all of the above







Whitten: Intro SA&D 1eOnline Learning Center

Home > Chapter 18 > Practice Quiz